This article is from page 31 of the 2009-09-22 edition of The Clare People. OCR mistakes are to be expected so download the original SWF or the rendered page 31 JPG
AN ODOUR circulating 1n the Shan- non area is annoying local residents, who want the matter to be investi- gated. The problem is caused by a blockage and Clare County Council is working on the issue.
At a meeting of Shannon area coun- cillors last week, Councillor Patricia McCarthy asked for a report to be presented, outlining the reasons why sewage odours are in existence, par- ticularly in the Ballycasey/Tullyvar- raga areas of the town.
In a written reply, from Clare
County Council, she was told that the main cause of the odour was a block- age in the inlet pipe leading to the pump station near Carraig Lia. This blockage has now been cleared. ‘However, there are large quanti- ties of solid materials coming to this pump station, which on occasion blocks both pumps, as well as the in- let line,’ stated Senior Executive En- gineer in Shannon, Eugene O’Shea. In order to alleviate the problem, works are underway at the pump station located near the Aidan Park traffic lights. This should reduce the loading on the pump station near
Carraig Lia. Mr O’Shea said that both pump houses will be cleaned out as part of the works, before the end of the month.
Cllr McCarthy said she was driving past Bunratty last weekend when she pale] B eee mete 0
“The whole town is stinked out of it,’ she said. She pointed out that checks should be carried out every week.
Independent Councillor Gerry Flynn said there was a smell in Shan- non last weekend and he has received several complaints about it. He asked why an upgrade of the water system
in the town had not been delivered. “The scheme in Shannon was to start in 2008 and that didn’t happen. We are into 2009. Quite a lot of in- frastructure has been loaded on to the system that we have,” he said. “Was it a funding problem that we didn’t start in 2008? With the current economic situation, when would you envisage it would start?” he asked. Engineer in water services Hugh McGrath said there have been a lot of delays in the planning process in Ennis, Shannon, Kilrush and Kilkee. He said there have been delays in get- ting approvals at the various stages.